big city

Get an instant ballpark solar estimate using satellites!

GET ESTIMATE!

Solar Panel System Installation Project in Columbus, New Jersey

In Columbus, New Jersey, the Guarino family decided to transition to solar energy, aiming to reduce their monthly costs during their retirement. Their chosen solar panel system is crafted by Hanwha and consists of 28 panels with a combined capacity of 7.926 kW. Installed on 2/20/19, the Guarinos have experienced significant savings since the system's inception. They've expressed how solar energy has substantially reduced their monthly expenses.

Solar energy offers a reduction in electricity bills and boosts the home's market value. With the increasing demand for eco-friendly homes in Columbus, solar installations are becoming a sought-after feature for potential homebuyers. New Jersey's supportive stance towards solar energy, through incentives like Solar Renewable Energy Credits (SRECs), makes the transition to solar even more enticing for homeowners.

Similar Projects

Edison NJ Solar Panel System Installation Project

Edison NJ Solar Panel System Installation Project

SYSTEM SPECIFICATIONS
  • Manufacturer: Hanwha
  • Number of Panels: 29
  • Kilowatts: 11.455kW
  • Installation Date: 05/16/2022
Boonton NJ Solar Panel System Installation Project

Boonton NJ Solar Panel System Installation Project

SYSTEM SPECIFICATIONS
  • Manufacturer: Hanwha Q CELLS
  • Number of Panels: 25
  • Kilowatts: 8kW
  • Installation Date: 03/20/2019
  • Time of Installation: 2 days
Atlantic Highlands NJ Solar Panel System Installation Project

Atlantic Highlands NJ Solar Panel System Installation Project

SYSTEM SPECIFICATIONS
  • Manufacturer: Hanwha Q CELLS G10
  • Number of Panels: 44
  • Kilowatts: 15.84kW
  • Installation Date: 12/20/2022
  • Time of Installation: 2 days

Similar Project

Solar Panel System Installation Project in Columbus, New Jersey

Solar Panel System Installation Project in Boonton, New Jersey

SYSTEM SPECIFICATIONS
  • Manufacturer: Hanwha Q CELLS
  • Number of Panels: 25
  • Kilowatts: 8kW
  • Installation Date: 03/20/2019
  • Time of Installation: 2 days